Skip to content
Toggle Navigation
About Us
History
Contact Us
Directions
Staff & Board
Join Us
Membership
Corporate Membership
Contributions
Capital Drive
Exhibits & Programs
Upcoming Events
Photos & Videos
Special: Elevator Tower Gallery
Main Street Ludlow, circa 1899 (1st Floor)
Ludlow Home, circa 1870 (1st Floor)
Old Theatre Curtain (3rd Floor)
Famous Alumni
Gift Shop
Links
Home
Special: Elevator Tower Gallery
Groundbreaking, July 3, 2008
Start of Digging, July 7, 2008
Elevator Shaft Start, July 17, 2008
Elevator Shaft forms, uly 22, 2008
Poured Foundation, July 25, 2008
Poured Foundation, July 25, 2008
Profile of a Knot-Holer, July 25, 2008
Prep for pouring lower wall July 29, 2008
Poured lower walls August 1, 2008
Backfilling lower wall August 5, 2008
Prep beam pockets August 12, 2008
\Hard hat time August 15, 2008
Steel Framework Hard hat time August 15, 2008
Steel Framework Hard hat time August 15, 2008
Framework for stairs in place August 19, 2008
Fire stairs framing, August 20, 2008
Steel framework with roof beams, August 25, 2008
Fire stairs with poured concrete, August 29, 2008
Final concrete pour, main floor, September 3, 2008
Stairways to the Stars, September 4, 2008
Preparing for Shell Installation, Sept. 12, 2008
Preparing for Shell Installation, Sept. 15, 2008
Partial Tower Enclosure, Sept. 22, 2008
Partial Tower Enclosure, Sept. 22, 2008
Partial Tower Enclosure, Sept. 23, 2008
Completed Shell Enclosure Sept. 30, 2008
Split Block Siding, Sept. 30, 2008
Brick work in progress, October 8, 2008
Completed Shell plus brick work, October 10, 2008
Completed Split Block Siding, October 10, 2008
Topping off some brick work, October 14, 2008
Shell with brick work, November 1, 2008
Stucco side November 7, 2008
Shell with brick work, November 1, 2008
Entry way to tower, November 7, 2008
3rd Floor, connection to BRAM, April 13, 2009
2nd Floor, connection to BRAM, April 13, 2009
1st Floor, connection to BRAM, April 13, 2009
Anita Alic takes air hammer to 1st flr opening, April 13, 2009
Wright crew with Georgia and Linda, April 13, 2009
More Air Hammer, April 13, 2009
Full Connection into Cellar, April 24, 2009
Georgia and Linda checkout 1st flr access, June 2, 2009
Wright workers prepare threshold, June 2, 2009
Elevator Wing Portico Entrance, June 2, 2009
Elevator Wing Entrance Door, June 2, 2009
Georgia and Anita Checkout elevator shaft October 31, 2011
Elevator Grand Opening, Richard Nye Does the Honors June 2, 2012
Elevator Grand Opening with Board of Directors June 2, 2012