Special: Elevator Tower Gallery
- Groundbreaking, July 3, 2008
- Start of Digging, July 7, 2008
- Elevator Shaft Start, July 17, 2008
- Elevator Shaft forms, uly 22, 2008
- Poured Foundation, July 25, 2008
- Poured Foundation, July 25, 2008
- Profile of a Knot-Holer, July 25, 2008
- Prep for pouring lower wall July 29, 2008
- Poured lower walls August 1, 2008
- Backfilling lower wall August 5, 2008
- Prep beam pockets August 12, 2008
- \Hard hat time August 15, 2008
- Steel Framework Hard hat time August 15, 2008
- Steel Framework Hard hat time August 15, 2008
- Framework for stairs in place August 19, 2008
- Fire stairs framing, August 20, 2008
- Steel framework with roof beams, August 25, 2008
- Fire stairs with poured concrete, August 29, 2008
- Final concrete pour, main floor, September 3, 2008
- Stairways to the Stars, September 4, 2008
- Preparing for Shell Installation, Sept. 12, 2008
- Preparing for Shell Installation, Sept. 15, 2008
- Partial Tower Enclosure, Sept. 22, 2008
- Partial Tower Enclosure, Sept. 22, 2008
- Partial Tower Enclosure, Sept. 23, 2008
- Completed Shell Enclosure Sept. 30, 2008
- Split Block Siding, Sept. 30, 2008
- Brick work in progress, October 8, 2008
- Completed Shell plus brick work, October 10, 2008
- Completed Split Block Siding, October 10, 2008
- Topping off some brick work, October 14, 2008
- Shell with brick work, November 1, 2008
- Stucco side November 7, 2008
- Shell with brick work, November 1, 2008
- Entry way to tower, November 7, 2008
- 3rd Floor, connection to BRAM, April 13, 2009
- 2nd Floor, connection to BRAM, April 13, 2009
- 1st Floor, connection to BRAM, April 13, 2009
- Anita Alic takes air hammer to 1st flr opening, April 13, 2009
- Wright crew with Georgia and Linda, April 13, 2009
- More Air Hammer, April 13, 2009
- Full Connection into Cellar, April 24, 2009
- Georgia and Linda checkout 1st flr access, June 2, 2009
- Wright workers prepare threshold, June 2, 2009
- Elevator Wing Portico Entrance, June 2, 2009
- Elevator Wing Entrance Door, June 2, 2009
- Georgia and Anita Checkout elevator shaft October 31, 2011
- Elevator Grand Opening, Richard Nye Does the Honors June 2, 2012
- Elevator Grand Opening with Board of Directors June 2, 2012